The Work generally involves interior renovations and minor exterior renovations. The Work includes but is not necessarily limited to: removal of flooring, baseboards, doors, millwork, plumbing fixtures, recessed waste receptacles; relocation of existing high density file storage system; installation of new flooring, epoxy floor finishes, baseboards, doors, frames and hardware, including barrier-free control devices, signage, millwork, washroom fixtures and accessories, steel stud framing, gypsum board, cement board, ceramic wall tiles, concrete block walls, hardwood bench and shelf; repair walls; modifications to suspended and acoustic ceilings, acoustic doors and frames, acoustic windows, as noted on the Project Drawings; adjustments to the existing anti-vault glazing to accommodate current PMM standards, included as Appendix D; repairs to exterior siding, window removal and exterior door relocation; infilling of area where interior and exterior wall and doors are removed; supply and installation of electrical systems including cable, conduit, circuit breakers, and telecommunications; lighting, overhead coiling door and hardware, fire alarm detection device, mechanical installations including ductwork and duct insulation, diffusers, registers, duct cleaning, commissioning, air balancing for office and cell areas and all work as specified herein and as shown on the Project Drawings